International Transit Corridor (ITC)

Construction of an Intercontinental Highway

In the course of the major project to install an International Transit Corridor (ITC) between Western Europe and Western China with a length of 8.445 km, JSC "K-Dorstroy" is currently constructing a new section of this ITC in southern Kazakhstan, on the territory of the Dzhambul region, with a length of about 58 km.

On one hand a part of the already existing road is to reconstruct and on the other hand a completely new road and three new bridges have to be built. The design of the road has four tracks (two on each side). Culverts and a new drainage systems will be installed as well.

After completion of the construction project the road part between km 536 and 593 is expected as

  • a concrete roadway of about 44 km in length,
  • a asphalt roadway of about 14 km in length and
  • three 3 bridges with a total length of approximately 226 m.

The contractually agreed upon scope of service contains the following elements:

  • Independent monthly review of the grade of completion and the performed quality;
  • Check of all monthly consumed materials;
  • Check of chief commercial and technical issues;
  • Preparation of a monthly status report regarding costs, quality and schedule.

KVL Consult checks and to controls the use of funds by JSC “K-Dorstroy” which are provided by JSC “ATFBank” as financing institute.

Project location: 
Taraz, Kazakhstan
Client: 
JSC “K-Dorstroy” / JSC “ATFBank” (financing)
Construction period: 

2010 - 2013

Offered Services: 
Controlling of costs, timelines and qualities